DEF-2026-0204NH — Naibati House
Backup generator not installed — per tenancy agreement
Description

Category: Electrical/Lighting. The backup power (generator) as per the tenancy agreement has not been completed. No generator sizing specified in the agreement. Formal letter to tenant recommended plus proper load-calculation before procurement (see genset CAPEX discussions — CARPTRAC 50 kVA vs Clyde 220 kVA quotes on file). Source: FCA 2025-11-04 §Site utilities.

Severity
major
Current status
open
Identified
2025-11-04

Tap to choose between camera and gallery. Photos are auto-compressed before upload.

Becomes part of the permanent record and the monthly report.

0/10

This update will be logged with your photos as evidence and will appear in the next monthly report.