Update+ Log defect
FMX • Commercial Management Solutions Pte Limited • Internal use
← Back to defects

No backup electrical system installed

DEF-2026-0128
MAJOROPENKH — Korobasaga House
Dispatch to vendor via WhatsAppUpdate status
Description

Category: Electrical/Lighting. No backup electrical system (generator or UPS) installed. Site loses power on grid outage. Source: original FCA 2025-11-07 §Electrical.

Identified
2025-11-07
Resolved
—

History (0)

No status changes logged. This defect is still in its original state.