Update+ Log defect
FMX • Commercial Management Solutions Pte Limited • Internal use

Defects

Showing 106 defects
Client
All (106)KGF (106)OOFI (0)
Status
Open (106)Resolved (84)All (190)
Property
All (106)GH (30)KH (37)NH (39)OOFI (0)
Severity
All (106)Critical (7)Major (27)Moderate (48)Minor (24)
RefPropertySeverityTitleStatusIdentifiedAction
DEF-2026-0212GHMODERATEFloodlight at back of Gunu House — replacementopen2026-10-22Raise WO
DEF-2026-0207KHMAJORL2 PS Office - Ceiling leakingopen2026-08-25Raise WO
DEF-2026-0206NHMODERATE4ft tube light level 1open2026-08-17Raise WO
DEF-2026-0140KHMAJORSewer waste easementopen2026-08-08Raise WO
DEF-2026-0139KHMAJORNeighbor grey water ingressopen2026-08-08Raise WO
DEF-2026-0137GHMODERATEDPP's office 24000BTU ACopen2026-07-30Raise WO
DEF-2026-0136NHMODERATEL2 Humans Rights Board roomopen2026-07-28Raise WO
DEF-2026-0135NHMODERATEL2 Humans Rights common office spaceopen2026-07-28Raise WO
DEF-2026-0134NHMODERATEL2 Manager Legal's officework ordered2026-07-27Raise WO
DEF-2026-0133NHMODERATEFenceopen2026-07-24Raise WO
DEF-2026-0120NHCRITICALThe Fire Detection/ Alarm System is not functioningopen2026-07-17Raise WO
DEF-2026-0117KHMODERATETube light fixtureopen2026-06-27Raise WO
DEF-2026-0116KHMODERATEMissing windowopen2026-06-27Raise WO
DEF-2026-0113GHMODERATEDPP's office windowopen2026-06-25Raise WO
DEF-2026-0111GHMINORMiddle floor men's washroom sinkopen2026-06-24Raise WO
DEF-2026-0110GHMODERATEMiddle floor lightsopen2026-06-24Raise WO
DEF-2026-0109GHMODERATETop floor kitchen lightsopen2026-06-24Raise WO
DEF-2026-0104KHMAJORWater leakopen2026-05-26Raise WO
DEF-2026-0030KHMODERATEAC drains not connected to downpipeopen2026-02-19Raise WO
DEF-2026-0027KHMAJORWater tank - no non-return valvesopen2026-02-19Raise WO
DEF-2026-0028KHMODERATEInstall shut-off valves for handbasins + sinksopen2026-02-19Raise WO
DEF-2026-0029KHMINORWater meter keys - service or installopen2026-02-19Raise WO
DEF-2026-0031KHMINORV drain covers - installopen2026-02-19Raise WO
DEF-2026-0058NHMAJORL2 Director's room GPOsopen2025-11-26Raise WO
DEF-2026-0055NHMODERATEL2 spare office GPOsopen2025-11-26Raise WO
DEF-2026-0051NHMINORL2 check & test switchesopen2025-11-26Raise WO
DEF-2026-0048NHMODERATEL2 redundant electrical/telecom cablingopen2025-11-26Raise WO
DEF-2026-0047NHMAJORL2 Sub-board test/label/upgradeopen2025-11-26Raise WO
DEF-2026-0054NHMINORL2 GPOs — general check and test required across flooropen2025-11-26Raise WO
DEF-2026-0033NHMAJORMSB inspection #2open2025-11-26Raise WO
DEF-2026-0032NHMAJORMSB inspection #1open2025-11-26Raise WO
DEF-2026-0075NHMODERATEL2 kitchen new IP-rated GPOopen2025-11-26Raise WO
DEF-2026-0069NHCRITICALL2 server room GPOs overloadedopen2025-11-26Raise WO
DEF-2026-0068NHMINORL2 male toilet switchopen2025-11-26Raise WO
DEF-2026-0059NHMODERATEL2 test GPOs & remove redundant cablingopen2025-11-26Raise WO
DEF-2026-0192KHMINORSurface ducting throughoutopen2025-11-07Raise WO
DEF-2026-0125KHCRITICALFire alarm control panel not active — smoke sensors inactiveopen2025-11-07Raise WO
DEF-2026-0126KHCRITICALNo fire hoses or extinguishers on siteopen2025-11-07Raise WO
DEF-2026-0127KHMODERATENo visible fire evacuation plansopen2025-11-07Raise WO
DEF-2026-0128KHMAJORNo backup electrical system installedopen2025-11-07Raise WO
DEF-2026-0129KHMAJOREmergency lighting requires upgradingopen2025-11-07Raise WO
DEF-2026-0130KHMAJORBackup power and water connection not completed at siteopen2025-11-07Raise WO
DEF-2026-0181KHMODERATEOutdoor AC units on ground — vehicle damage riskopen2025-11-07Raise WO
DEF-2026-0182KHMODERATENo emergency muster point signageopen2025-11-07Raise WO
DEF-2026-0183KHMODERATEPedestrian areas blocked — temporary structures and discarded furnitureopen2025-11-07Raise WO
DEF-2026-0184KHMODERATEFence sections require new galvanised meshopen2025-11-07Raise WO
DEF-2026-0185KHMODERATEV-drains and vegetation removal requiredopen2025-11-07Raise WO
DEF-2026-0186KHMINORWall/slab joint cleaning to prevent growthopen2025-11-07Raise WO
DEF-2026-0187KHMODERATERoof gutters likely require cleaningopen2025-11-07Raise WO
DEF-2026-0188KHMAJORNon-compliant AC split-unit pipework penetrationsopen2025-11-07Raise WO
DEF-2026-0189KHCRITICALDetached storage structure blocks fire escapeopen2025-11-07Raise WO
DEF-2026-0190KHMODERATENon fire-rated partitions installedopen2025-11-07Raise WO
DEF-2026-0191KHMAJORNo visible exit or emergency evacuation signageopen2025-11-07Raise WO
DEF-2026-0193KHMODERATENo Disability accessopen2025-11-07Raise WO
DEF-2026-0195KHMAJORIncomplete plumbing works for backup water supplyopen2025-11-07Raise WO
DEF-2026-0198KHMODERATEDownpipes, fixings, V-drains and downpipe drains — cleaningopen2025-11-07Raise WO
DEF-2026-0199KHMODERATEEstablish AC servicing and testing regimeopen2025-11-07Raise WO
DEF-2026-0200KHMODERATECompliant HVAC penetrations required on AC changeoutsopen2025-11-07Raise WO
DEF-2026-0201KHMINORRemove redundant AC unitsopen2025-11-07Raise WO
DEF-2026-0202KHMAJORMSB and sub-boards — RCD/load testing requiredopen2025-11-07Raise WO
DEF-2026-0203KHMINOROld fluorescent tube lighting — upgrade opportunityopen2025-11-07Raise WO
DEF-2026-0161GHMAJORDriveway pavement damage — FRA responsibilityopen2025-11-04Raise WO
DEF-2026-0162GHMODERATEBackup water supply — sub-standard installationopen2025-11-04Raise WO
DEF-2026-0163GHMINORLandscaping — minor drain cleaning and clearingopen2025-11-04Raise WO
DEF-2026-0164GHMAJORRecurring sewer manhole overflow during heavy rainopen2025-11-04Raise WO
DEF-2026-0165GHMODERATERoof gutters likely require cleaningopen2025-11-04Raise WO
DEF-2026-0166GHMINORExternal surfaces — rust stains and mould cleaningopen2025-11-04Raise WO
DEF-2026-0167GHMODERATERotting external timber cladding at lobby/waiting areaopen2025-11-04Raise WO
DEF-2026-0168GHMINORBlanking plate for old access control penetrationopen2025-11-04Raise WO
DEF-2026-0169GHMINORTimber stairs — sand and re-glaze refurbishmentopen2025-11-04Raise WO
DEF-2026-0170GHMODERATENon-slip strips on stair treads (tenant request)open2025-11-04Raise WO
DEF-2026-0171GHMINORWater supply pressure testing recommendedopen2025-11-04Raise WO
DEF-2026-0172GHMAJORSewer line overflow at entryopen2025-11-04Raise WO
DEF-2026-0173GHMODERATEEstablish AC servicing and testing regimeopen2025-11-04Raise WO
DEF-2026-0174GHMINORRemove redundant AC unitsopen2025-11-04Raise WO
DEF-2026-0175GHMODERATEHVAC testing/balancing/controls in PM regimeopen2025-11-04Raise WO
DEF-2026-0176GHMINORChimneys and vents follow-up auditopen2025-11-04Raise WO
DEF-2026-0177GHMAJORMSB and sub-boards — RCD/load testing requiredopen2025-11-04Raise WO
DEF-2026-0178GHMAJORGround-floor tea room GPO constantly trippingopen2025-11-04Raise WO
DEF-2026-0179GHMODERATEIP65 GPO required for hot water unit in staff bathroomopen2025-11-04Raise WO
DEF-2026-0180GHMINOROld fluorescent/CFL lighting — upgrade opportunityopen2025-11-04Raise WO
DEF-2026-0123GHMINORFire evacuation plan drawings fadedopen2025-11-04Raise WO
DEF-2026-0122GHMODERATEFire extinguishers and hoses require servicing auditopen2025-11-04Raise WO
DEF-2026-0121GHCRITICALFire alarm control panel not activeopen2025-11-04Raise WO
DEF-2026-0204NHMAJORBackup generator not installed — per tenancy agreementopen2025-11-04Raise WO
DEF-2026-0205NHMAJORBackup water supply connection/installation not completedopen2025-11-04Raise WO
DEF-2026-0124GHMODERATEBackup generator follow-up audit requiredopen2025-11-04Raise WO
DEF-2026-0141NHMAJORDriveway chamber cover requires replacementopen2025-11-04Raise WO
DEF-2026-0142NHMODERATENo emergency muster point signageopen2025-11-04Raise WO
DEF-2026-0143NHMODERATEPedestrian access blocked — discarded material on siteopen2025-11-04Raise WO
DEF-2026-0144NHMINORWall/slab joint cleaning to prevent growthopen2025-11-04Raise WO
DEF-2026-0146NHMODERATEMain roof gutters require cleaningopen2025-11-04Raise WO
DEF-2026-0147NHMINORConcrete window sills require cleaningopen2025-11-04Raise WO
DEF-2026-0148NHMINORInterior finishes tired — wet area tiles and ceilingsopen2025-11-04Raise WO
DEF-2026-0149NHMINORKitchenette cabinets need updating and expansionopen2025-11-04Raise WO
DEF-2026-0150NHMAJORNo visible exit signs or emergency evacuation signageopen2025-11-04Raise WO
DEF-2026-0145NHCRITICALElevator — shaft, well and full conveyance inspection requiredopen2025-11-04Raise WO
DEF-2026-0152NHMODERATEAdditional sanitary facilities with Disability accessopen2025-11-04Raise WO
DEF-2026-0153NHMINORNo sanitary bins or sanitary services provider engagedopen2025-11-04Raise WO
DEF-2026-0154NHMODERATEStormwater drains require checking and clearingopen2025-11-04Raise WO
DEF-2026-0155NHMODERATEEstablish AC servicing and testing regimeopen2025-11-04Raise WO
DEF-2026-0156NHMODERATECompliant HVAC penetrations requiredopen2025-11-04Raise WO
DEF-2026-0157NHMAJORFire alarm control panel not installed — manual call points onlyopen2025-11-04Raise WO
DEF-2026-0158NHMODERATENo visible fire evacuation route plansopen2025-11-04Raise WO
DEF-2026-0159NHMAJORElectrical and telecom closets — rubbish/cleaning items stored — OHS/fire riskopen2025-11-04Raise WO
DEF-2026-0160NHMODERATELightning protection requires licensed electrical inspectionopen2025-11-04Raise WO