| DEF-2026-0207 | KH | MAJOR | L2 PS Office - Ceiling leaking | open | 2026-08-25 |
| DEF-2026-0206 | NH | MODERATE | 4ft tube light level 1 | open | 2026-08-17 |
| DEF-2026-0140 | KH | MAJOR | Sewer waste easement | open | 2026-08-08 |
| DEF-2026-0139 | KH | MAJOR | Neighbor grey water ingress | open | 2026-08-08 |
| DEF-2026-0137 | GH | MODERATE | DPP's office 24000BTU AC | open | 2026-07-30 |
| DEF-2026-0136 | NH | MODERATE | L2 Humans Rights Board room | open | 2026-07-28 |
| DEF-2026-0135 | NH | MODERATE | L2 Humans Rights common office space | open | 2026-07-28 |
| DEF-2026-0134 | NH | MODERATE | L2 Manager Legal's office | work ordered | 2026-07-27 |
| DEF-2026-0133 | NH | MODERATE | Fence | open | 2026-07-24 |
| DEF-2026-0120 | NH | CRITICAL | The Fire Detection/ Alarm System is not functioning | open | 2026-07-17 |
| DEF-2026-0117 | KH | MODERATE | Tube light fixture | open | 2026-06-27 |
| DEF-2026-0116 | KH | MODERATE | Missing window | open | 2026-06-27 |
| DEF-2026-0113 | GH | MODERATE | DPP's office window | open | 2026-06-25 |
| DEF-2026-0111 | GH | MINOR | Middle floor men's washroom sink | open | 2026-06-24 |
| DEF-2026-0110 | GH | MODERATE | Middle floor lights | open | 2026-06-24 |
| DEF-2026-0109 | GH | MODERATE | Top floor kitchen lights | open | 2026-06-24 |
| DEF-2026-0104 | KH | MAJOR | Water leak | open | 2026-05-26 |
| DEF-2026-0029 | KH | MINOR | Water meter keys - service or install | open | 2026-02-19 |
| DEF-2026-0031 | KH | MINOR | V drain covers - install | open | 2026-02-19 |
| DEF-2026-0027 | KH | MAJOR | Water tank - no non-return valves | open | 2026-02-19 |
| DEF-2026-0028 | KH | MODERATE | Install shut-off valves for handbasins + sinks | open | 2026-02-19 |
| DEF-2026-0030 | KH | MODERATE | AC drains not connected to downpipe | open | 2026-02-19 |
| DEF-2026-0059 | NH | MODERATE | L2 test GPOs & remove redundant cabling | open | 2025-11-26 |
| DEF-2026-0058 | NH | MAJOR | L2 Director's room GPOs | open | 2025-11-26 |
| DEF-2026-0055 | NH | MODERATE | L2 spare office GPOs | open | 2025-11-26 |
| DEF-2026-0051 | NH | MINOR | L2 check & test switches | open | 2025-11-26 |
| DEF-2026-0048 | NH | MODERATE | L2 redundant electrical/telecom cabling | open | 2025-11-26 |
| DEF-2026-0047 | NH | MAJOR | L2 Sub-board test/label/upgrade | open | 2025-11-26 |
| DEF-2026-0033 | NH | MAJOR | MSB inspection #2 | open | 2025-11-26 |
| DEF-2026-0032 | NH | MAJOR | MSB inspection #1 | open | 2025-11-26 |
| DEF-2026-0054 | NH | MINOR | L2 GPOs — general check and test required across floor | open | 2025-11-26 |
| DEF-2026-0075 | NH | MODERATE | L2 kitchen new IP-rated GPO | open | 2025-11-26 |
| DEF-2026-0069 | NH | CRITICAL | L2 server room GPOs overloaded | open | 2025-11-26 |
| DEF-2026-0068 | NH | MINOR | L2 male toilet switch | open | 2025-11-26 |
| DEF-2026-0191 | KH | MAJOR | No visible exit or emergency evacuation signage | open | 2025-11-07 |
| DEF-2026-0125 | KH | CRITICAL | Fire alarm control panel not active — smoke sensors inactive | open | 2025-11-07 |
| DEF-2026-0126 | KH | CRITICAL | No fire hoses or extinguishers on site | open | 2025-11-07 |
| DEF-2026-0127 | KH | MODERATE | No visible fire evacuation plans | open | 2025-11-07 |
| DEF-2026-0128 | KH | MAJOR | No backup electrical system installed | open | 2025-11-07 |
| DEF-2026-0129 | KH | MAJOR | Emergency lighting requires upgrading | open | 2025-11-07 |
| DEF-2026-0130 | KH | MAJOR | Backup power and water connection not completed at site | open | 2025-11-07 |
| DEF-2026-0181 | KH | MODERATE | Outdoor AC units on ground — vehicle damage risk | open | 2025-11-07 |
| DEF-2026-0182 | KH | MODERATE | No emergency muster point signage | open | 2025-11-07 |
| DEF-2026-0183 | KH | MODERATE | Pedestrian areas blocked — temporary structures and discarded furniture | open | 2025-11-07 |
| DEF-2026-0184 | KH | MODERATE | Fence sections require new galvanised mesh | open | 2025-11-07 |
| DEF-2026-0185 | KH | MODERATE | V-drains and vegetation removal required | open | 2025-11-07 |
| DEF-2026-0186 | KH | MINOR | Wall/slab joint cleaning to prevent growth | open | 2025-11-07 |
| DEF-2026-0187 | KH | MODERATE | Roof gutters likely require cleaning | open | 2025-11-07 |
| DEF-2026-0188 | KH | MAJOR | Non-compliant AC split-unit pipework penetrations | open | 2025-11-07 |
| DEF-2026-0189 | KH | CRITICAL | Detached storage structure blocks fire escape | open | 2025-11-07 |
| DEF-2026-0190 | KH | MODERATE | Non fire-rated partitions installed | open | 2025-11-07 |
| DEF-2026-0192 | KH | MINOR | Surface ducting throughout | open | 2025-11-07 |
| DEF-2026-0193 | KH | MODERATE | No Disability access | open | 2025-11-07 |
| DEF-2026-0195 | KH | MAJOR | Incomplete plumbing works for backup water supply | open | 2025-11-07 |
| DEF-2026-0198 | KH | MODERATE | Downpipes, fixings, V-drains and downpipe drains — cleaning | open | 2025-11-07 |
| DEF-2026-0199 | KH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-07 |
| DEF-2026-0200 | KH | MODERATE | Compliant HVAC penetrations required on AC changeouts | open | 2025-11-07 |
| DEF-2026-0201 | KH | MINOR | Remove redundant AC units | open | 2025-11-07 |
| DEF-2026-0202 | KH | MAJOR | MSB and sub-boards — RCD/load testing required | open | 2025-11-07 |
| DEF-2026-0203 | KH | MINOR | Old fluorescent tube lighting — upgrade opportunity | open | 2025-11-07 |
| DEF-2026-0160 | NH | MODERATE | Lightning protection requires licensed electrical inspection | open | 2025-11-04 |
| DEF-2026-0161 | GH | MAJOR | Driveway pavement damage — FRA responsibility | open | 2025-11-04 |
| DEF-2026-0162 | GH | MODERATE | Backup water supply — sub-standard installation | open | 2025-11-04 |
| DEF-2026-0163 | GH | MINOR | Landscaping — minor drain cleaning and clearing | open | 2025-11-04 |
| DEF-2026-0164 | GH | MAJOR | Recurring sewer manhole overflow during heavy rain | open | 2025-11-04 |
| DEF-2026-0165 | GH | MODERATE | Roof gutters likely require cleaning | open | 2025-11-04 |
| DEF-2026-0166 | GH | MINOR | External surfaces — rust stains and mould cleaning | open | 2025-11-04 |
| DEF-2026-0167 | GH | MODERATE | Rotting external timber cladding at lobby/waiting area | open | 2025-11-04 |
| DEF-2026-0168 | GH | MINOR | Blanking plate for old access control penetration | open | 2025-11-04 |
| DEF-2026-0169 | GH | MINOR | Timber stairs — sand and re-glaze refurbishment | open | 2025-11-04 |
| DEF-2026-0170 | GH | MODERATE | Non-slip strips on stair treads (tenant request) | open | 2025-11-04 |
| DEF-2026-0171 | GH | MINOR | Water supply pressure testing recommended | open | 2025-11-04 |
| DEF-2026-0172 | GH | MAJOR | Sewer line overflow at entry | open | 2025-11-04 |
| DEF-2026-0173 | GH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-04 |
| DEF-2026-0174 | GH | MINOR | Remove redundant AC units | open | 2025-11-04 |
| DEF-2026-0175 | GH | MODERATE | HVAC testing/balancing/controls in PM regime | open | 2025-11-04 |
| DEF-2026-0176 | GH | MINOR | Chimneys and vents follow-up audit | open | 2025-11-04 |
| DEF-2026-0177 | GH | MAJOR | MSB and sub-boards — RCD/load testing required | open | 2025-11-04 |
| DEF-2026-0178 | GH | MAJOR | Ground-floor tea room GPO constantly tripping | open | 2025-11-04 |
| DEF-2026-0179 | GH | MODERATE | IP65 GPO required for hot water unit in staff bathroom | open | 2025-11-04 |
| DEF-2026-0180 | GH | MINOR | Old fluorescent/CFL lighting — upgrade opportunity | open | 2025-11-04 |
| DEF-2026-0123 | GH | MINOR | Fire evacuation plan drawings faded | open | 2025-11-04 |
| DEF-2026-0121 | GH | CRITICAL | Fire alarm control panel not active | open | 2025-11-04 |
| DEF-2026-0204 | NH | MAJOR | Backup generator not installed — per tenancy agreement | open | 2025-11-04 |
| DEF-2026-0205 | NH | MAJOR | Backup water supply connection/installation not completed | open | 2025-11-04 |
| DEF-2026-0122 | GH | MODERATE | Fire extinguishers and hoses require servicing audit | open | 2025-11-04 |
| DEF-2026-0124 | GH | MODERATE | Backup generator follow-up audit required | open | 2025-11-04 |
| DEF-2026-0141 | NH | MAJOR | Driveway chamber cover requires replacement | open | 2025-11-04 |
| DEF-2026-0142 | NH | MODERATE | No emergency muster point signage | open | 2025-11-04 |
| DEF-2026-0143 | NH | MODERATE | Pedestrian access blocked — discarded material on site | open | 2025-11-04 |
| DEF-2026-0144 | NH | MINOR | Wall/slab joint cleaning to prevent growth | open | 2025-11-04 |
| DEF-2026-0146 | NH | MODERATE | Main roof gutters require cleaning | open | 2025-11-04 |
| DEF-2026-0147 | NH | MINOR | Concrete window sills require cleaning | open | 2025-11-04 |
| DEF-2026-0148 | NH | MINOR | Interior finishes tired — wet area tiles and ceilings | open | 2025-11-04 |
| DEF-2026-0149 | NH | MINOR | Kitchenette cabinets need updating and expansion | open | 2025-11-04 |
| DEF-2026-0150 | NH | MAJOR | No visible exit signs or emergency evacuation signage | open | 2025-11-04 |
| DEF-2026-0145 | NH | CRITICAL | Elevator — shaft, well and full conveyance inspection required | open | 2025-11-04 |
| DEF-2026-0152 | NH | MODERATE | Additional sanitary facilities with Disability access | open | 2025-11-04 |
| DEF-2026-0153 | NH | MINOR | No sanitary bins or sanitary services provider engaged | open | 2025-11-04 |
| DEF-2026-0154 | NH | MODERATE | Stormwater drains require checking and clearing | open | 2025-11-04 |
| DEF-2026-0155 | NH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-04 |
| DEF-2026-0156 | NH | MODERATE | Compliant HVAC penetrations required | open | 2025-11-04 |
| DEF-2026-0157 | NH | MAJOR | Fire alarm control panel not installed — manual call points only | open | 2025-11-04 |
| DEF-2026-0158 | NH | MODERATE | No visible fire evacuation route plans | open | 2025-11-04 |
| DEF-2026-0159 | NH | MAJOR | Electrical and telecom closets — rubbish/cleaning items stored — OHS/fire risk | open | 2025-11-04 |