| DEF-2026-0207 | KH | MAJOR | L2 PS Office - Ceiling leaking | open | 2026-08-25 | — |
| DEF-2026-0206 | NH | MODERATE | 4ft tube light level 1 | open | 2026-08-17 | — |
| DEF-2026-0140 | KH | MAJOR | Sewer waste easement | open | 2026-08-08 | — |
| DEF-2026-0139 | KH | MAJOR | Neighbor grey water ingress | open | 2026-08-08 | — |
| DEF-2026-0138 | NH | MAJOR | Mango Tree Removal | resolved | 2026-08-02 | 2026-08-18 |
| DEF-2026-0137 | GH | MODERATE | DPP's office 24000BTU AC | open | 2026-07-30 | — |
| DEF-2026-0136 | NH | MODERATE | L2 Humans Rights Board room | open | 2026-07-28 | — |
| DEF-2026-0135 | NH | MODERATE | L2 Humans Rights common office space | open | 2026-07-28 | — |
| DEF-2026-0134 | NH | MODERATE | L2 Manager Legal's office | work ordered | 2026-07-27 | — |
| DEF-2026-0133 | NH | MODERATE | Fence | open | 2026-07-24 | — |
| DEF-2026-0120 | NH | CRITICAL | The Fire Detection/ Alarm System is not functioning | open | 2026-07-17 | — |
| DEF-2026-0117 | KH | MODERATE | Tube light fixture | open | 2026-06-27 | — |
| DEF-2026-0116 | KH | MODERATE | Missing window | open | 2026-06-27 | — |
| DEF-2026-0115 | KH | MAJOR | Leaking toilet | resolved | 2026-06-27 | 2026-07-06 |
| DEF-2026-0114 | KH | MAJOR | Leaking toilet | resolved | 2026-06-27 | 2026-07-07 |
| DEF-2026-0113 | GH | MODERATE | DPP's office window | open | 2026-06-25 | — |
| DEF-2026-0112 | GH | MODERATE | Ground floor lights in Livai's office | resolved | 2026-06-24 | 2026-07-07 |
| DEF-2026-0111 | GH | MINOR | Middle floor men's washroom sink | open | 2026-06-24 | — |
| DEF-2026-0110 | GH | MODERATE | Middle floor lights | open | 2026-06-24 | — |
| DEF-2026-0109 | GH | MODERATE | Top floor kitchen lights | open | 2026-06-24 | — |
| DEF-2026-0107 | GH | MODERATE | Light in DPP Secretary's room | resolved | 2026-06-24 | 2026-07-07 |
| DEF-2026-0106 | KH | MAJOR | Roof leak | resolved | 2026-06-16 | 2026-07-07 |
| DEF-2026-0105 | NH | MODERATE | Bulbs in ground floor reception need replacing | resolved | 2026-06-02 | 2026-06-02 |
| DEF-2026-0104 | KH | MAJOR | Water leak | open | 2026-05-26 | — |
| DEF-2026-0029 | KH | MINOR | Water meter keys - service or install | open | 2026-02-19 | — |
| DEF-2026-0031 | KH | MINOR | V drain covers - install | open | 2026-02-19 | — |
| DEF-2026-0027 | KH | MAJOR | Water tank - no non-return valves | open | 2026-02-19 | — |
| DEF-2026-0028 | KH | MODERATE | Install shut-off valves for handbasins + sinks | open | 2026-02-19 | — |
| DEF-2026-0030 | KH | MODERATE | AC drains not connected to downpipe | open | 2026-02-19 | — |
| DEF-2026-0016 | KH | MINOR | L2 Male T1 - seat cover | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0015 | KH | MINOR | L2 Kitchenette - tap fixing | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0014 | KH | MINOR | L1 Female Handbasin - tap | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0013 | KH | MODERATE | L1 Female Toilet - cistern leak | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0012 | KH | MODERATE | L1 Female - floor waste | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0011 | KH | MODERATE | L1 Female Shower - head + pipe | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0010 | KH | MODERATE | L1 Male Handbasin - sink + tap | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0009 | KH | MAJOR | L1 Male Urinal - blockage | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0008 | KH | MAJOR | L1 Male T2 - pan connector leak | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0007 | KH | MINOR | L1 Male T1 - cistern + seat | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0006 | KH | MODERATE | L1 Kitchen - tap + blockage | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0002 | KH | MAJOR | G Male - toilet pan connector | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0003 | KH | MINOR | G Male - general works | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0004 | KH | MODERATE | G Female - shower head | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0023 | KH | MODERATE | External - outdoor water pipe | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0005 | KH | MINOR | G Female - toilet seat | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0024 | KH | MAJOR | External - meter leak | resolved | 2026-02-19 | 2026-02-20 |
| DEF-2026-0025 | KH | MINOR | External V Drains - rubbish | resolved | 2026-02-19 | 2026-02-20 |
| DEF-2026-0026 | KH | MINOR | External V Drains - clearing | resolved | 2026-02-19 | 2026-02-20 |
| DEF-2026-0022 | KH | MINOR | L2 Female Handbasin - strainer | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0021 | KH | MODERATE | L2 Female T1 - pan + cistern | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0001 | KH | MODERATE | G Male - shower head | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0020 | KH | MINOR | L2 Female T2 - seat + cistern | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0019 | KH | MODERATE | L2 Male Handbasin - tap + hose | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0018 | KH | MAJOR | L2 Male Urinal - blocked flush | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0017 | KH | MAJOR | L2 Male T2 - pan connector leak | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0095 | NH | MODERATE | L2 Male — toilet leak | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0076 | NH | MODERATE | External — V drain & pipes cleared | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0077 | NH | MINOR | External — V drain #2 | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0078 | NH | MINOR | External — V drain #3 | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0079 | NH | MINOR | External — downpipe bracket | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0080 | NH | MAJOR | External — chamber cover | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0081 | NH | MODERATE | External — water meters leak | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0082 | NH | MINOR | External — additional item | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0083 | NH | MODERATE | External — driveway blocked drain | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0084 | NH | MINOR | External — downpipe bracket #2 | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0085 | NH | MODERATE | GF Kitchen — sink leak | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0086 | NH | MINOR | GF unspecified item | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0087 | NH | MODERATE | GF Mens — urinals cleared | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0088 | NH | MINOR | GF Mens — washers / tap | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0089 | NH | MODERATE | GF Mens T1 — cistern float | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0090 | NH | MODERATE | GF Ladies T2 — pan connector | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0091 | NH | MAJOR | L1 Male — urinals cleared | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0092 | NH | MINOR | L1 Kitchen — washers | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0093 | NH | MINOR | L1 Ladies T1 — seat connector | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0094 | NH | MINOR | L1 Ladies — service & clean | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0096 | NH | MODERATE | L2 Male toilet — leak & seat | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0097 | NH | MINOR | L2 Female — handbasin seals | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0098 | NH | MODERATE | L2 — leaks | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0099 | NH | MINOR | L2 Female — washers | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0100 | NH | MINOR | L2 Male — float | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0101 | NH | MINOR | L2 Male T1 — service | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0102 | NH | MODERATE | L2 Male T2 — new cistern | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0103 | NH | MINOR | L2 Kitchen — neck/seal | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0038 | NH | MINOR | L1 troffer tubes #1-5 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0039 | NH | MINOR | L1 troffer tubes #7-9 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0040 | NH | MINOR | L1 troffer tubes #10-12 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0041 | NH | MINOR | L1 troffer tube #13 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0042 | NH | MINOR | L1 troffer tube #14 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0043 | NH | MINOR | L1 troffer tubes #15-16 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0044 | NH | MINOR | L1 troffer tube #17 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0036 | NH | MODERATE | L1 Female toilet GPO & light | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0035 | NH | MINOR | L1 Male toilet tube light defective | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0034 | NH | MINOR | Passage way tube light defective | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0069 | NH | CRITICAL | L2 server room GPOs overloaded | open | 2025-11-26 | — |
| DEF-2026-0068 | NH | MINOR | L2 male toilet switch | open | 2025-11-26 | — |
| DEF-2026-0059 | NH | MODERATE | L2 test GPOs & remove redundant cabling | open | 2025-11-26 | — |
| DEF-2026-0058 | NH | MAJOR | L2 Director's room GPOs | open | 2025-11-26 | — |
| DEF-2026-0055 | NH | MODERATE | L2 spare office GPOs | open | 2025-11-26 | — |
| DEF-2026-0032 | NH | MAJOR | MSB inspection #1 | open | 2025-11-26 | — |
| DEF-2026-0033 | NH | MAJOR | MSB inspection #2 | open | 2025-11-26 | — |
| DEF-2026-0075 | NH | MODERATE | L2 kitchen new IP-rated GPO | open | 2025-11-26 | — |
| DEF-2026-0045 | NH | MINOR | L1 troffer tube #18 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0067 | NH | MINOR | L2 male toilet lights defective | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0061 | NH | MINOR | L2 tube lights defective #4 | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0052 | NH | MINOR | L2 tube light defective #3 | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0050 | NH | MINOR | L2 tube light defective #2 | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0049 | NH | MINOR | L2 tube lights defective #1 | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0046 | NH | MINOR | L1 reception downlights | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0051 | NH | MINOR | L2 check & test switches | open | 2025-11-26 | — |
| DEF-2026-0048 | NH | MODERATE | L2 redundant electrical/telecom cabling | open | 2025-11-26 | — |
| DEF-2026-0047 | NH | MAJOR | L2 Sub-board test/label/upgrade | open | 2025-11-26 | — |
| DEF-2026-0054 | NH | MINOR | L2 GPOs — general check and test required across floor | open | 2025-11-26 | — |
| DEF-2026-0037 | NH | MINOR | L1 troffer tube #6 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0194 | KH | MODERATE | Some toilet pans cracked | resolved | 2025-11-07 | 2026-02-18 |
| DEF-2026-0125 | KH | CRITICAL | Fire alarm control panel not active — smoke sensors inactive | open | 2025-11-07 | — |
| DEF-2026-0126 | KH | CRITICAL | No fire hoses or extinguishers on site | open | 2025-11-07 | — |
| DEF-2026-0127 | KH | MODERATE | No visible fire evacuation plans | open | 2025-11-07 | — |
| DEF-2026-0128 | KH | MAJOR | No backup electrical system installed | open | 2025-11-07 | — |
| DEF-2026-0129 | KH | MAJOR | Emergency lighting requires upgrading | open | 2025-11-07 | — |
| DEF-2026-0130 | KH | MAJOR | Backup power and water connection not completed at site | open | 2025-11-07 | — |
| DEF-2026-0181 | KH | MODERATE | Outdoor AC units on ground — vehicle damage risk | open | 2025-11-07 | — |
| DEF-2026-0182 | KH | MODERATE | No emergency muster point signage | open | 2025-11-07 | — |
| DEF-2026-0183 | KH | MODERATE | Pedestrian areas blocked — temporary structures and discarded furniture | open | 2025-11-07 | — |
| DEF-2026-0184 | KH | MODERATE | Fence sections require new galvanised mesh | open | 2025-11-07 | — |
| DEF-2026-0185 | KH | MODERATE | V-drains and vegetation removal required | open | 2025-11-07 | — |
| DEF-2026-0186 | KH | MINOR | Wall/slab joint cleaning to prevent growth | open | 2025-11-07 | — |
| DEF-2026-0187 | KH | MODERATE | Roof gutters likely require cleaning | open | 2025-11-07 | — |
| DEF-2026-0188 | KH | MAJOR | Non-compliant AC split-unit pipework penetrations | open | 2025-11-07 | — |
| DEF-2026-0189 | KH | CRITICAL | Detached storage structure blocks fire escape | open | 2025-11-07 | — |
| DEF-2026-0190 | KH | MODERATE | Non fire-rated partitions installed | open | 2025-11-07 | — |
| DEF-2026-0191 | KH | MAJOR | No visible exit or emergency evacuation signage | open | 2025-11-07 | — |
| DEF-2026-0192 | KH | MINOR | Surface ducting throughout | open | 2025-11-07 | — |
| DEF-2026-0193 | KH | MODERATE | No Disability access | open | 2025-11-07 | — |
| DEF-2026-0195 | KH | MAJOR | Incomplete plumbing works for backup water supply | open | 2025-11-07 | — |
| DEF-2026-0196 | KH | MAJOR | At least one leaking toilet pan per floor | resolved | 2025-11-07 | 2026-02-18 |
| DEF-2026-0197 | KH | MAJOR | Ground floor under-sink waste lines constantly blocked | resolved | 2025-11-07 | 2026-02-18 |
| DEF-2026-0198 | KH | MODERATE | Downpipes, fixings, V-drains and downpipe drains — cleaning | open | 2025-11-07 | — |
| DEF-2026-0199 | KH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-07 | — |
| DEF-2026-0200 | KH | MODERATE | Compliant HVAC penetrations required on AC changeouts | open | 2025-11-07 | — |
| DEF-2026-0201 | KH | MINOR | Remove redundant AC units | open | 2025-11-07 | — |
| DEF-2026-0202 | KH | MAJOR | MSB and sub-boards — RCD/load testing required | open | 2025-11-07 | — |
| DEF-2026-0203 | KH | MINOR | Old fluorescent tube lighting — upgrade opportunity | open | 2025-11-07 | — |
| DEF-2026-0163 | GH | MINOR | Landscaping — minor drain cleaning and clearing | open | 2025-11-04 | — |
| DEF-2026-0164 | GH | MAJOR | Recurring sewer manhole overflow during heavy rain | open | 2025-11-04 | — |
| DEF-2026-0165 | GH | MODERATE | Roof gutters likely require cleaning | open | 2025-11-04 | — |
| DEF-2026-0166 | GH | MINOR | External surfaces — rust stains and mould cleaning | open | 2025-11-04 | — |
| DEF-2026-0167 | GH | MODERATE | Rotting external timber cladding at lobby/waiting area | open | 2025-11-04 | — |
| DEF-2026-0168 | GH | MINOR | Blanking plate for old access control penetration | open | 2025-11-04 | — |
| DEF-2026-0169 | GH | MINOR | Timber stairs — sand and re-glaze refurbishment | open | 2025-11-04 | — |
| DEF-2026-0170 | GH | MODERATE | Non-slip strips on stair treads (tenant request) | open | 2025-11-04 | — |
| DEF-2026-0171 | GH | MINOR | Water supply pressure testing recommended | open | 2025-11-04 | — |
| DEF-2026-0172 | GH | MAJOR | Sewer line overflow at entry | open | 2025-11-04 | — |
| DEF-2026-0173 | GH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-04 | — |
| DEF-2026-0174 | GH | MINOR | Remove redundant AC units | open | 2025-11-04 | — |
| DEF-2026-0175 | GH | MODERATE | HVAC testing/balancing/controls in PM regime | open | 2025-11-04 | — |
| DEF-2026-0176 | GH | MINOR | Chimneys and vents follow-up audit | open | 2025-11-04 | — |
| DEF-2026-0177 | GH | MAJOR | MSB and sub-boards — RCD/load testing required | open | 2025-11-04 | — |
| DEF-2026-0178 | GH | MAJOR | Ground-floor tea room GPO constantly tripping | open | 2025-11-04 | — |
| DEF-2026-0179 | GH | MODERATE | IP65 GPO required for hot water unit in staff bathroom | open | 2025-11-04 | — |
| DEF-2026-0180 | GH | MINOR | Old fluorescent/CFL lighting — upgrade opportunity | open | 2025-11-04 | — |
| DEF-2026-0204 | NH | MAJOR | Backup generator not installed — per tenancy agreement | open | 2025-11-04 | — |
| DEF-2026-0205 | NH | MAJOR | Backup water supply connection/installation not completed | open | 2025-11-04 | — |
| DEF-2026-0122 | GH | MODERATE | Fire extinguishers and hoses require servicing audit | open | 2025-11-04 | — |
| DEF-2026-0123 | GH | MINOR | Fire evacuation plan drawings faded | open | 2025-11-04 | — |
| DEF-2026-0121 | GH | CRITICAL | Fire alarm control panel not active | open | 2025-11-04 | — |
| DEF-2026-0124 | GH | MODERATE | Backup generator follow-up audit required | open | 2025-11-04 | — |
| DEF-2026-0141 | NH | MAJOR | Driveway chamber cover requires replacement | open | 2025-11-04 | — |
| DEF-2026-0142 | NH | MODERATE | No emergency muster point signage | open | 2025-11-04 | — |
| DEF-2026-0143 | NH | MODERATE | Pedestrian access blocked — discarded material on site | open | 2025-11-04 | — |
| DEF-2026-0144 | NH | MINOR | Wall/slab joint cleaning to prevent growth | open | 2025-11-04 | — |
| DEF-2026-0146 | NH | MODERATE | Main roof gutters require cleaning | open | 2025-11-04 | — |
| DEF-2026-0147 | NH | MINOR | Concrete window sills require cleaning | open | 2025-11-04 | — |
| DEF-2026-0148 | NH | MINOR | Interior finishes tired — wet area tiles and ceilings | open | 2025-11-04 | — |
| DEF-2026-0149 | NH | MINOR | Kitchenette cabinets need updating and expansion | open | 2025-11-04 | — |
| DEF-2026-0150 | NH | MAJOR | No visible exit signs or emergency evacuation signage | open | 2025-11-04 | — |
| DEF-2026-0145 | NH | CRITICAL | Elevator — shaft, well and full conveyance inspection required | open | 2025-11-04 | — |
| DEF-2026-0152 | NH | MODERATE | Additional sanitary facilities with Disability access | open | 2025-11-04 | — |
| DEF-2026-0153 | NH | MINOR | No sanitary bins or sanitary services provider engaged | open | 2025-11-04 | — |
| DEF-2026-0154 | NH | MODERATE | Stormwater drains require checking and clearing | open | 2025-11-04 | — |
| DEF-2026-0155 | NH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-04 | — |
| DEF-2026-0156 | NH | MODERATE | Compliant HVAC penetrations required | open | 2025-11-04 | — |
| DEF-2026-0157 | NH | MAJOR | Fire alarm control panel not installed — manual call points only | open | 2025-11-04 | — |
| DEF-2026-0158 | NH | MODERATE | No visible fire evacuation route plans | open | 2025-11-04 | — |
| DEF-2026-0159 | NH | MAJOR | Electrical and telecom closets — rubbish/cleaning items stored — OHS/fire risk | open | 2025-11-04 | — |
| DEF-2026-0160 | NH | MODERATE | Lightning protection requires licensed electrical inspection | open | 2025-11-04 | — |
| DEF-2026-0161 | GH | MAJOR | Driveway pavement damage — FRA responsibility | open | 2025-11-04 | — |
| DEF-2026-0162 | GH | MODERATE | Backup water supply — sub-standard installation | open | 2025-11-04 | — |