| DEF-2026-0206 | NH | MODERATE | 4ft tube light level 1 | open | 2026-08-17 |
| DEF-2026-0136 | NH | MODERATE | L2 Humans Rights Board room | open | 2026-07-28 |
| DEF-2026-0135 | NH | MODERATE | L2 Humans Rights common office space | open | 2026-07-28 |
| DEF-2026-0134 | NH | MODERATE | L2 Manager Legal's office | work ordered | 2026-07-27 |
| DEF-2026-0133 | NH | MODERATE | Fence | open | 2026-07-24 |
| DEF-2026-0120 | NH | CRITICAL | The Fire Detection/ Alarm System is not functioning | open | 2026-07-17 |
| DEF-2026-0058 | NH | MAJOR | L2 Director's room GPOs | open | 2025-11-26 |
| DEF-2026-0059 | NH | MODERATE | L2 test GPOs & remove redundant cabling | open | 2025-11-26 |
| DEF-2026-0068 | NH | MINOR | L2 male toilet switch | open | 2025-11-26 |
| DEF-2026-0069 | NH | CRITICAL | L2 server room GPOs overloaded | open | 2025-11-26 |
| DEF-2026-0075 | NH | MODERATE | L2 kitchen new IP-rated GPO | open | 2025-11-26 |
| DEF-2026-0054 | NH | MINOR | L2 GPOs — general check and test required across floor | open | 2025-11-26 |
| DEF-2026-0032 | NH | MAJOR | MSB inspection #1 | open | 2025-11-26 |
| DEF-2026-0033 | NH | MAJOR | MSB inspection #2 | open | 2025-11-26 |
| DEF-2026-0047 | NH | MAJOR | L2 Sub-board test/label/upgrade | open | 2025-11-26 |
| DEF-2026-0048 | NH | MODERATE | L2 redundant electrical/telecom cabling | open | 2025-11-26 |
| DEF-2026-0051 | NH | MINOR | L2 check & test switches | open | 2025-11-26 |
| DEF-2026-0055 | NH | MODERATE | L2 spare office GPOs | open | 2025-11-26 |
| DEF-2026-0142 | NH | MODERATE | No emergency muster point signage | open | 2025-11-04 |
| DEF-2026-0143 | NH | MODERATE | Pedestrian access blocked — discarded material on site | open | 2025-11-04 |
| DEF-2026-0144 | NH | MINOR | Wall/slab joint cleaning to prevent growth | open | 2025-11-04 |
| DEF-2026-0146 | NH | MODERATE | Main roof gutters require cleaning | open | 2025-11-04 |
| DEF-2026-0147 | NH | MINOR | Concrete window sills require cleaning | open | 2025-11-04 |
| DEF-2026-0148 | NH | MINOR | Interior finishes tired — wet area tiles and ceilings | open | 2025-11-04 |
| DEF-2026-0149 | NH | MINOR | Kitchenette cabinets need updating and expansion | open | 2025-11-04 |
| DEF-2026-0150 | NH | MAJOR | No visible exit signs or emergency evacuation signage | open | 2025-11-04 |
| DEF-2026-0145 | NH | CRITICAL | Elevator — shaft, well and full conveyance inspection required | open | 2025-11-04 |
| DEF-2026-0152 | NH | MODERATE | Additional sanitary facilities with Disability access | open | 2025-11-04 |
| DEF-2026-0153 | NH | MINOR | No sanitary bins or sanitary services provider engaged | open | 2025-11-04 |
| DEF-2026-0154 | NH | MODERATE | Stormwater drains require checking and clearing | open | 2025-11-04 |
| DEF-2026-0155 | NH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-04 |
| DEF-2026-0156 | NH | MODERATE | Compliant HVAC penetrations required | open | 2025-11-04 |
| DEF-2026-0157 | NH | MAJOR | Fire alarm control panel not installed — manual call points only | open | 2025-11-04 |
| DEF-2026-0158 | NH | MODERATE | No visible fire evacuation route plans | open | 2025-11-04 |
| DEF-2026-0159 | NH | MAJOR | Electrical and telecom closets — rubbish/cleaning items stored — OHS/fire risk | open | 2025-11-04 |
| DEF-2026-0160 | NH | MODERATE | Lightning protection requires licensed electrical inspection | open | 2025-11-04 |
| DEF-2026-0204 | NH | MAJOR | Backup generator not installed — per tenancy agreement | open | 2025-11-04 |
| DEF-2026-0205 | NH | MAJOR | Backup water supply connection/installation not completed | open | 2025-11-04 |
| DEF-2026-0141 | NH | MAJOR | Driveway chamber cover requires replacement | open | 2025-11-04 |