| DEF-2026-0137 | GH | MODERATE | DPP's office 24000BTU AC | open | 2026-07-30 | — |
| DEF-2026-0113 | GH | MODERATE | DPP's office window | open | 2026-06-25 | — |
| DEF-2026-0112 | GH | MODERATE | Ground floor lights in Livai's office | resolved | 2026-06-24 | 2026-07-07 |
| DEF-2026-0111 | GH | MINOR | Middle floor men's washroom sink | open | 2026-06-24 | — |
| DEF-2026-0110 | GH | MODERATE | Middle floor lights | open | 2026-06-24 | — |
| DEF-2026-0109 | GH | MODERATE | Top floor kitchen lights | open | 2026-06-24 | — |
| DEF-2026-0107 | GH | MODERATE | Light in DPP Secretary's room | resolved | 2026-06-24 | 2026-07-07 |
| DEF-2026-0163 | GH | MINOR | Landscaping — minor drain cleaning and clearing | open | 2025-11-04 | — |
| DEF-2026-0164 | GH | MAJOR | Recurring sewer manhole overflow during heavy rain | open | 2025-11-04 | — |
| DEF-2026-0165 | GH | MODERATE | Roof gutters likely require cleaning | open | 2025-11-04 | — |
| DEF-2026-0166 | GH | MINOR | External surfaces — rust stains and mould cleaning | open | 2025-11-04 | — |
| DEF-2026-0167 | GH | MODERATE | Rotting external timber cladding at lobby/waiting area | open | 2025-11-04 | — |
| DEF-2026-0168 | GH | MINOR | Blanking plate for old access control penetration | open | 2025-11-04 | — |
| DEF-2026-0169 | GH | MINOR | Timber stairs — sand and re-glaze refurbishment | open | 2025-11-04 | — |
| DEF-2026-0170 | GH | MODERATE | Non-slip strips on stair treads (tenant request) | open | 2025-11-04 | — |
| DEF-2026-0171 | GH | MINOR | Water supply pressure testing recommended | open | 2025-11-04 | — |
| DEF-2026-0172 | GH | MAJOR | Sewer line overflow at entry | open | 2025-11-04 | — |
| DEF-2026-0173 | GH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-04 | — |
| DEF-2026-0174 | GH | MINOR | Remove redundant AC units | open | 2025-11-04 | — |
| DEF-2026-0175 | GH | MODERATE | HVAC testing/balancing/controls in PM regime | open | 2025-11-04 | — |
| DEF-2026-0176 | GH | MINOR | Chimneys and vents follow-up audit | open | 2025-11-04 | — |
| DEF-2026-0177 | GH | MAJOR | MSB and sub-boards — RCD/load testing required | open | 2025-11-04 | — |
| DEF-2026-0178 | GH | MAJOR | Ground-floor tea room GPO constantly tripping | open | 2025-11-04 | — |
| DEF-2026-0179 | GH | MODERATE | IP65 GPO required for hot water unit in staff bathroom | open | 2025-11-04 | — |
| DEF-2026-0180 | GH | MINOR | Old fluorescent/CFL lighting — upgrade opportunity | open | 2025-11-04 | — |
| DEF-2026-0121 | GH | CRITICAL | Fire alarm control panel not active | open | 2025-11-04 | — |
| DEF-2026-0122 | GH | MODERATE | Fire extinguishers and hoses require servicing audit | open | 2025-11-04 | — |
| DEF-2026-0123 | GH | MINOR | Fire evacuation plan drawings faded | open | 2025-11-04 | — |
| DEF-2026-0124 | GH | MODERATE | Backup generator follow-up audit required | open | 2025-11-04 | — |
| DEF-2026-0161 | GH | MAJOR | Driveway pavement damage — FRA responsibility | open | 2025-11-04 | — |
| DEF-2026-0162 | GH | MODERATE | Backup water supply — sub-standard installation | open | 2025-11-04 | — |