| DEF-2026-0206 | NH | MODERATE | 4ft tube light level 1 | open | 2026-08-17 | — |
| DEF-2026-0138 | NH | MAJOR | Mango Tree Removal | resolved | 2026-08-02 | 2026-08-18 |
| DEF-2026-0136 | NH | MODERATE | L2 Humans Rights Board room | open | 2026-07-28 | — |
| DEF-2026-0135 | NH | MODERATE | L2 Humans Rights common office space | open | 2026-07-28 | — |
| DEF-2026-0134 | NH | MODERATE | L2 Manager Legal's office | work ordered | 2026-07-27 | — |
| DEF-2026-0133 | NH | MODERATE | Fence | open | 2026-07-24 | — |
| DEF-2026-0120 | NH | CRITICAL | The Fire Detection/ Alarm System is not functioning | open | 2026-07-17 | — |
| DEF-2026-0105 | NH | MODERATE | Bulbs in ground floor reception need replacing | resolved | 2026-06-02 | 2026-06-02 |
| DEF-2026-0100 | NH | MINOR | L2 Male — float | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0101 | NH | MINOR | L2 Male T1 — service | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0102 | NH | MODERATE | L2 Male T2 — new cistern | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0103 | NH | MINOR | L2 Kitchen — neck/seal | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0076 | NH | MODERATE | External — V drain & pipes cleared | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0077 | NH | MINOR | External — V drain #2 | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0078 | NH | MINOR | External — V drain #3 | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0079 | NH | MINOR | External — downpipe bracket | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0080 | NH | MAJOR | External — chamber cover | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0081 | NH | MODERATE | External — water meters leak | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0082 | NH | MINOR | External — additional item | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0083 | NH | MODERATE | External — driveway blocked drain | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0084 | NH | MINOR | External — downpipe bracket #2 | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0085 | NH | MODERATE | GF Kitchen — sink leak | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0086 | NH | MINOR | GF unspecified item | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0087 | NH | MODERATE | GF Mens — urinals cleared | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0088 | NH | MINOR | GF Mens — washers / tap | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0089 | NH | MODERATE | GF Mens T1 — cistern float | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0090 | NH | MODERATE | GF Ladies T2 — pan connector | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0092 | NH | MINOR | L1 Kitchen — washers | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0091 | NH | MAJOR | L1 Male — urinals cleared | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0093 | NH | MINOR | L1 Ladies T1 — seat connector | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0094 | NH | MINOR | L1 Ladies — service & clean | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0095 | NH | MODERATE | L2 Male — toilet leak | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0096 | NH | MODERATE | L2 Male toilet — leak & seat | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0097 | NH | MINOR | L2 Female — handbasin seals | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0098 | NH | MODERATE | L2 — leaks | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0099 | NH | MINOR | L2 Female — washers | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0034 | NH | MINOR | Passage way tube light defective | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0033 | NH | MAJOR | MSB inspection #2 | open | 2025-11-26 | — |
| DEF-2026-0047 | NH | MAJOR | L2 Sub-board test/label/upgrade | open | 2025-11-26 | — |
| DEF-2026-0048 | NH | MODERATE | L2 redundant electrical/telecom cabling | open | 2025-11-26 | — |
| DEF-2026-0051 | NH | MINOR | L2 check & test switches | open | 2025-11-26 | — |
| DEF-2026-0055 | NH | MODERATE | L2 spare office GPOs | open | 2025-11-26 | — |
| DEF-2026-0058 | NH | MAJOR | L2 Director's room GPOs | open | 2025-11-26 | — |
| DEF-2026-0059 | NH | MODERATE | L2 test GPOs & remove redundant cabling | open | 2025-11-26 | — |
| DEF-2026-0068 | NH | MINOR | L2 male toilet switch | open | 2025-11-26 | — |
| DEF-2026-0069 | NH | CRITICAL | L2 server room GPOs overloaded | open | 2025-11-26 | — |
| DEF-2026-0032 | NH | MAJOR | MSB inspection #1 | open | 2025-11-26 | — |
| DEF-2026-0035 | NH | MINOR | L1 Male toilet tube light defective | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0036 | NH | MODERATE | L1 Female toilet GPO & light | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0046 | NH | MINOR | L1 reception downlights | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0049 | NH | MINOR | L2 tube lights defective #1 | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0050 | NH | MINOR | L2 tube light defective #2 | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0052 | NH | MINOR | L2 tube light defective #3 | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0061 | NH | MINOR | L2 tube lights defective #4 | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0067 | NH | MINOR | L2 male toilet lights defective | resolved | 2025-11-26 | 2026-08-14 |
| DEF-2026-0075 | NH | MODERATE | L2 kitchen new IP-rated GPO | open | 2025-11-26 | — |
| DEF-2026-0054 | NH | MINOR | L2 GPOs — general check and test required across floor | open | 2025-11-26 | — |
| DEF-2026-0037 | NH | MINOR | L1 troffer tube #6 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0038 | NH | MINOR | L1 troffer tubes #1-5 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0039 | NH | MINOR | L1 troffer tubes #7-9 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0040 | NH | MINOR | L1 troffer tubes #10-12 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0041 | NH | MINOR | L1 troffer tube #13 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0042 | NH | MINOR | L1 troffer tube #14 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0043 | NH | MINOR | L1 troffer tubes #15-16 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0044 | NH | MINOR | L1 troffer tube #17 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0045 | NH | MINOR | L1 troffer tube #18 | resolved | 2025-11-26 | 2025-11-26 |
| DEF-2026-0142 | NH | MODERATE | No emergency muster point signage | open | 2025-11-04 | — |
| DEF-2026-0143 | NH | MODERATE | Pedestrian access blocked — discarded material on site | open | 2025-11-04 | — |
| DEF-2026-0144 | NH | MINOR | Wall/slab joint cleaning to prevent growth | open | 2025-11-04 | — |
| DEF-2026-0146 | NH | MODERATE | Main roof gutters require cleaning | open | 2025-11-04 | — |
| DEF-2026-0147 | NH | MINOR | Concrete window sills require cleaning | open | 2025-11-04 | — |
| DEF-2026-0148 | NH | MINOR | Interior finishes tired — wet area tiles and ceilings | open | 2025-11-04 | — |
| DEF-2026-0149 | NH | MINOR | Kitchenette cabinets need updating and expansion | open | 2025-11-04 | — |
| DEF-2026-0150 | NH | MAJOR | No visible exit signs or emergency evacuation signage | open | 2025-11-04 | — |
| DEF-2026-0145 | NH | CRITICAL | Elevator — shaft, well and full conveyance inspection required | open | 2025-11-04 | — |
| DEF-2026-0152 | NH | MODERATE | Additional sanitary facilities with Disability access | open | 2025-11-04 | — |
| DEF-2026-0153 | NH | MINOR | No sanitary bins or sanitary services provider engaged | open | 2025-11-04 | — |
| DEF-2026-0154 | NH | MODERATE | Stormwater drains require checking and clearing | open | 2025-11-04 | — |
| DEF-2026-0155 | NH | MODERATE | Establish AC servicing and testing regime | open | 2025-11-04 | — |
| DEF-2026-0156 | NH | MODERATE | Compliant HVAC penetrations required | open | 2025-11-04 | — |
| DEF-2026-0157 | NH | MAJOR | Fire alarm control panel not installed — manual call points only | open | 2025-11-04 | — |
| DEF-2026-0158 | NH | MODERATE | No visible fire evacuation route plans | open | 2025-11-04 | — |
| DEF-2026-0159 | NH | MAJOR | Electrical and telecom closets — rubbish/cleaning items stored — OHS/fire risk | open | 2025-11-04 | — |
| DEF-2026-0160 | NH | MODERATE | Lightning protection requires licensed electrical inspection | open | 2025-11-04 | — |
| DEF-2026-0204 | NH | MAJOR | Backup generator not installed — per tenancy agreement | open | 2025-11-04 | — |
| DEF-2026-0205 | NH | MAJOR | Backup water supply connection/installation not completed | open | 2025-11-04 | — |
| DEF-2026-0141 | NH | MAJOR | Driveway chamber cover requires replacement | open | 2025-11-04 | — |