| DEF-2026-0207 | KH | MAJOR | L2 PS Office - Ceiling leaking | open | 2026-08-25 | — |
| DEF-2026-0140 | KH | MAJOR | Sewer waste easement | open | 2026-08-08 | — |
| DEF-2026-0139 | KH | MAJOR | Neighbor grey water ingress | open | 2026-08-08 | — |
| DEF-2026-0138 | NH | MAJOR | Mango Tree Removal | resolved | 2026-08-02 | 2026-08-18 |
| DEF-2026-0115 | KH | MAJOR | Leaking toilet | resolved | 2026-06-27 | 2026-07-06 |
| DEF-2026-0114 | KH | MAJOR | Leaking toilet | resolved | 2026-06-27 | 2026-07-07 |
| DEF-2026-0106 | KH | MAJOR | Roof leak | resolved | 2026-06-16 | 2026-07-07 |
| DEF-2026-0104 | KH | MAJOR | Water leak | open | 2026-05-26 | — |
| DEF-2026-0027 | KH | MAJOR | Water tank - no non-return valves | open | 2026-02-19 | — |
| DEF-2026-0017 | KH | MAJOR | L2 Male T2 - pan connector leak | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0002 | KH | MAJOR | G Male - toilet pan connector | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0018 | KH | MAJOR | L2 Male Urinal - blocked flush | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0024 | KH | MAJOR | External - meter leak | resolved | 2026-02-19 | 2026-02-20 |
| DEF-2026-0008 | KH | MAJOR | L1 Male T2 - pan connector leak | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0009 | KH | MAJOR | L1 Male Urinal - blockage | resolved | 2026-02-19 | 2026-02-19 |
| DEF-2026-0091 | NH | MAJOR | L1 Male — urinals cleared | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0080 | NH | MAJOR | External — chamber cover | resolved | 2026-02-13 | 2026-02-13 |
| DEF-2026-0058 | NH | MAJOR | L2 Director's room GPOs | open | 2025-11-26 | — |
| DEF-2026-0047 | NH | MAJOR | L2 Sub-board test/label/upgrade | open | 2025-11-26 | — |
| DEF-2026-0033 | NH | MAJOR | MSB inspection #2 | open | 2025-11-26 | — |
| DEF-2026-0032 | NH | MAJOR | MSB inspection #1 | open | 2025-11-26 | — |
| DEF-2026-0196 | KH | MAJOR | At least one leaking toilet pan per floor | resolved | 2025-11-07 | 2026-02-18 |
| DEF-2026-0128 | KH | MAJOR | No backup electrical system installed | open | 2025-11-07 | — |
| DEF-2026-0129 | KH | MAJOR | Emergency lighting requires upgrading | open | 2025-11-07 | — |
| DEF-2026-0130 | KH | MAJOR | Backup power and water connection not completed at site | open | 2025-11-07 | — |
| DEF-2026-0188 | KH | MAJOR | Non-compliant AC split-unit pipework penetrations | open | 2025-11-07 | — |
| DEF-2026-0191 | KH | MAJOR | No visible exit or emergency evacuation signage | open | 2025-11-07 | — |
| DEF-2026-0195 | KH | MAJOR | Incomplete plumbing works for backup water supply | open | 2025-11-07 | — |
| DEF-2026-0197 | KH | MAJOR | Ground floor under-sink waste lines constantly blocked | resolved | 2025-11-07 | 2026-02-18 |
| DEF-2026-0202 | KH | MAJOR | MSB and sub-boards — RCD/load testing required | open | 2025-11-07 | — |
| DEF-2026-0177 | GH | MAJOR | MSB and sub-boards — RCD/load testing required | open | 2025-11-04 | — |
| DEF-2026-0178 | GH | MAJOR | Ground-floor tea room GPO constantly tripping | open | 2025-11-04 | — |
| DEF-2026-0205 | NH | MAJOR | Backup water supply connection/installation not completed | open | 2025-11-04 | — |
| DEF-2026-0141 | NH | MAJOR | Driveway chamber cover requires replacement | open | 2025-11-04 | — |
| DEF-2026-0204 | NH | MAJOR | Backup generator not installed — per tenancy agreement | open | 2025-11-04 | — |
| DEF-2026-0150 | NH | MAJOR | No visible exit signs or emergency evacuation signage | open | 2025-11-04 | — |
| DEF-2026-0157 | NH | MAJOR | Fire alarm control panel not installed — manual call points only | open | 2025-11-04 | — |
| DEF-2026-0159 | NH | MAJOR | Electrical and telecom closets — rubbish/cleaning items stored — OHS/fire risk | open | 2025-11-04 | — |
| DEF-2026-0161 | GH | MAJOR | Driveway pavement damage — FRA responsibility | open | 2025-11-04 | — |
| DEF-2026-0164 | GH | MAJOR | Recurring sewer manhole overflow during heavy rain | open | 2025-11-04 | — |
| DEF-2026-0172 | GH | MAJOR | Sewer line overflow at entry | open | 2025-11-04 | — |